RoughDesigns
Take the sketches above, some dim photos from inside the flood ravaged building, let simmer in the brain pan for a couple of days and voila..... the estimate below (all work allocated to each user group - a funding issue).  No structural engineer on board - no problem - an hour of research and in it goes, complete with piles.

Click estimate above to open full estimate.Click the files below to open other samples of estimates and the production drawings that were used in their creation.

Document Library

NameDescription
Document11_-_Flood_Damaged_Schematic_Plans11_-_Schematic_Plans
Document12_-_Flood_Damaged_Schematic_12_-_Ck_and_Comments
Document13_-_Flood_Damaged_Schematic_13_-_Final_Single_Sheet
Document14_-_Flood_Damaged_Schematic_14_-_Final_Est
Document15_-_Offices_Design_Development_15_-_Est_Single_Sheet
Document16_-_Offices_Design_Development_16_-_Cover_Expaneded_Est
Document17_-_Offices_Design_Development_17_-_Est
Document18_-_PS_Lab_Est_18_-_single_sheet
Document19_-_PS_Lab_Est19_-_PS_Lab_Est
Document20_-_PS_Interior_Repairs_Scope_20_-_Waterproofing_Est
Document21_-_PS_Exterior_Modernization21_-_CD_Est
Document22_-_Townhouse_CD_Est22_-_Townhouse_CD_Est
Document22_-_Townhouse_CD_Est22_-_Townhouse_CD_Est
Document23_-_Auditorium_Refurbishment23_-_CD_Est
Document24_-_Auditorium_Refinishing_CD24_-_Est
Document25_-_Offices_Natural_History25_-_CD_Est
Document26_-_Scenic_Overlook26_-_CD_Est
Document27_-_Toilet_Refurbishment_CD27_-_Est
Document28_-_Office_Management_28_-_PL_and_Staffing_-_Linked_wkshts

Estimating

 

I'm told I'm good at estimating. 


I suspect it's a combination of:


Construction Administration experience.


Hands on construction experience.


MEP engineering experience.

 

Endless research and reading about the nuts and bolts of building.


Vivid imagination.


The example to the left is for a post Katrina evaluation of a major community center.

 

This is the best I've ever done.  Given little more then one line diagrams and photos I turned out a FEMA acceptable detailed cost estimate for a nearly 10 million dollar multiuse center

 

Though I've done the same for projects from homes to ice rinks.

 

How To Estimate

 

Instructions for jr. staff to enable them to usefully contribute to cost estimating projects without leaving too much work out.

 

-- Coming Soon --